Summer Job 2023

This tour is finished.

Please log in to send a report.



Opening date and time

01/07/2023 00:01 UTC

Closing date and time

31/08/2023 23:55 UTC

Total distance

14029 NM


Rules

General rules for tours

  • Those general rules for tours are applicable to all French division pilot's tours. Are excluded ATC tours and Special Operations tours. 
  • Some tours might have specific rules. In case of conflict, specific rules overrule general rules. 
  • All flight must be performed online on IVAO network, with real weather. They have to be accomplished in real time rate (simulation rate x1 only, accelerated mode prohibited) 
  • Legs must be accomplished in the published order 
  • Speed restrictions IAS<250kts below FL100 must be observed.
  • During cruise phases, a disconnection up to 20 minutes is tolerated, providing the fact that it does not disturb the network operation, especially under ATC coverage. Please report any disconnection in your pilot report. 
  • The use of UNICOM in text or voice mode, in absence of active ATC online, is MANDATORY. Legs might be rejected if not compliant. 
  • All legs must be validated by sending a pilot report. It is essential to read and understand validator's comment for each leg, including if the leg is validated. We advise to not pursue the tour without validation of previous leg. 
  • Pilot report must be sent within 12 days following the flight date. Any leg sent outside the window will be rejected. 
  • Pilot report must include list of ATC contacted during the flight, and procedures performed during the flight. 
  • A 'Direct to' is allowed, only with ATC instruction. Please mention any direct obtained in the pilot report. 
  • It is mandatory to disconnect from the network at the end of each flight. 
  • Pilots will be particularly aware of:
    • In IFR:
      • Parity Odd/Even
      • Minimum and maximum airways altitudes
      • Published procedures when ATC is offline
    • In VFR:
  • Take a really good care of your flight plan:
    • Flight plan with wrong or misspelled airports will be rejected
    • Filled equipment must be compatible with the aircraft
  • Prevailing flight plan will be the active one during take off
  • Operate the flights under military or any other Special Operation type is not allowed. Type of flight must only be G, S or N. 
  • It is requested to be connected on the network at least 2 minutes before take off, and stay connected at least 2 minutes after landing. This will allow the tracker to save your flight entirely. 
  • An IFR route, IFPS compliant at the time it is published, might be proposed on some legs. It is only a suggestion, you can perfectly fly your own route. 
  • One flight can only be reported once, for one leg on one tour, even if the leg can fit for 2 tours or more.
  • Flight as a crew of two pilots, with shared cockpit functionality, is permitted on division's tours. However, only the pilot "master" of the connection is allowed to fill a pirep. The second pilot, connected as an observer, will not be allowed to fill a report based on this flight. 
  • Should there is any follow-up or contestation after a leg validation, everything has to be sent only at tour@ivao.fr. Supported languages are English or French. They have to be sent no later than 7 days after leg validation

Specific rules for the Summer Job 2023 tour :

  • This tour is exclusively an IFR tour. Only I/IFR rules will be allowed.
  • All pilots completing the legs before August 31st 2023 2359z will be granted with the Divisional IFR Tour Award: 

List of legs

LegsDistanceStatusActions
1. LFML - LICC575 NM- Details
2. LICC - LFST740 NM- Details
3. LFST - LDPL339 NM- Details
4. LDPL - LFLL376 NM- Details
5. LFLL - LCPH1410 NM- Details
6. LCPH - LFPO1576 NM- Details
7. LFPO - ZZZZ (optional leg)-- Details
8. ZZZZ - LFPG (optional leg)-- Details
9. LFPG - LPMA1308 NM- Details
10. LPMA - LFRN1147 NM- Details
11. LFRN - LOWI531 NM- Details
12. LOWI - LFBD523 NM- Details
13. LFBD - LEMH370 NM- Details
14. LEMH - LFSB486 NM- Details
15. LFSB - LTBJ1024 NM- Details
16. LTBJ - LFOB1266 NM- Details
17. LFOB - DTTA835 NM- Details
18. DTTA - LFRB948 NM- Details
19. LFRB - LEBL510 NM- Details
20. LEBL - LFML189 NM- Details